IS WORK OVER?

Automation index

How much of a Cabin manager’s job can AI already do?

A briefing comes earlier. Evacuating and the cabin obeying do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Cabin manager

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Briefing, door assignment and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Cabin, the difficult passenger and turbulence.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Service, allergies and the one who is ill.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Safety, the demo and the kit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Delay, overbooking and the one who will not sit.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Evacuate for real, and sign the cabin.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • cabin briefing
  • assign doors
  • difficult passenger
  • safety demo
  • onboard allergies
  • overbooking
  • evacuate
  • turbulence

Sources for this job· O*NET 53-2031.00· ESCO/ISCO 5111

Geomatics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Station, the base and the cloud.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the axis and the one that moved.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Model, the drift and not hiding metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the setting-out and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not signing the drift.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the axis is there, and not signing metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • point clouds
  • total stations
  • axes
  • setting-out
  • drift
  • bases
  • geomatics
  • the field

Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165

Analyse my job

Jobs with similar scores

  1. 559Politician20%
  2. 560Harbour pilot20%
  3. 561Chiropractor20%
  4. 563Lift technician20%
  5. 564Boiler technician20%
  6. 565Sonographer20%