IS WORK OVER?

Automation index

How much of a Cabin manager’s job can AI already do?

A briefing comes earlier. Evacuating and the cabin obeying do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Cabin manager

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Briefing, door assignment and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Cabin, the difficult passenger and turbulence.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Service, allergies and the one who is ill.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Safety, the demo and the kit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Delay, overbooking and the one who will not sit.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Evacuate for real, and sign the cabin.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • cabin briefing
  • assign doors
  • difficult passenger
  • safety demo
  • onboard allergies
  • overbooking
  • evacuate
  • turbulence

Sources for this job· O*NET 53-2031.00· ESCO/ISCO 5111

Power-plant operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-point, parameters and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Room, alarms and the one that trips.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Start, stop and not skipping the SOP.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Maintenance, isolation and the permit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The peak, the grid and not forcing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
The set-point, and not tripping.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • set-points
  • control room
  • plant SOP
  • starts
  • isolations
  • alarms
  • dispatch
  • the grid

Sources for this job· O*NET 51-8013.00· ESCO/ISCO 3131

Analyse my job

Jobs with similar scores

  1. 464Politician20%
  2. 465Harbour pilot20%
  3. 466Chiropractor20%
  4. 468Lift technician20%
  5. 469Boiler technician20%
  6. 470Sonographer20%