IS WORK OVER?

Automation index

How much of a Cabin manager’s job can AI already do?

A briefing comes earlier. Evacuating and the cabin obeying do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Cabin manager

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Briefing, door assignment and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Cabin, the difficult passenger and turbulence.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Service, allergies and the one who is ill.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Safety, the demo and the kit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Delay, overbooking and the one who will not sit.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Evacuate for real, and sign the cabin.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • cabin briefing
  • assign doors
  • difficult passenger
  • safety demo
  • onboard allergies
  • overbooking
  • evacuate
  • turbulence

Sources for this job· O*NET 53-2031.00· ESCO/ISCO 5111

Robotics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Paths, PLC and the cell twin.
Estimate

No public source provides a precise figure. This is our estimate.

16%48%+7.7
Cell, grippers and the cycle that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Safety, fencing and CE validation.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Maintenance, backups and the overwritten program.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Production, takt and the robot that stops.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it takes nobody with it, and signing the cell.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • program robots
  • paths
  • robot cells
  • safety fencing
  • cell PLC
  • CE validation
  • grippers
  • takt

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 464Politician20%
  2. 465Harbour pilot20%
  3. 466Chiropractor20%
  4. 468Lift technician20%
  5. 469Boiler technician20%
  6. 470Sonographer20%