IS WORK OVER?

Automation index

How much of a Cabin manager’s job can AI already do?

A briefing comes earlier. Evacuating and the cabin obeying do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Cabin manager

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Briefing, door assignment and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Cabin, the difficult passenger and turbulence.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Service, allergies and the one who is ill.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Safety, the demo and the kit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Delay, overbooking and the one who will not sit.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Evacuate for real, and sign the cabin.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • cabin briefing
  • assign doors
  • difficult passenger
  • safety demo
  • onboard allergies
  • overbooking
  • evacuate
  • turbulence

Sources for this job· O*NET 53-2031.00· ESCO/ISCO 5111

Site engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Setting-out, axes and the level.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Rebar, cover and the one that is missing.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Concrete, the slump and not pouring if it fails.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Note, the diary and not dressing the delay.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The site manager, the rush and not covering bad steel.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That the column is there, and not covering the steel.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • setting-out
  • axes
  • rebar
  • cover
  • slump
  • site diary
  • levels
  • not cover steel

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 552Politician20%
  2. 553Harbour pilot20%
  3. 554Chiropractor20%
  4. 556Lift technician20%
  5. 557Boiler technician20%
  6. 558Sonographer20%