IS WORK OVER?

Automation index

How much of a Cabinetmaker’s job can AI already do?

A cutting list and a CNC come earlier. Fitting a piece into a real flat does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Cabinetmaker

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Cutting list, CNC and ironmongery lists.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Assemble, veneer and fit in the shop.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Install in the home and leave it true.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Client, real measures and changes.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Finishes, varnish and repairs.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Not delivering a drawer that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Cutting list, CNC and ironmongery lists
  • Assemble, veneer and fit in the shop
  • Install in the home and leave it true
  • Client, real measures and changes
  • Finishes, varnish and repairs
  • ebanista
  • cabinetmaker
  • mueble a medida

Sources for this job· O*NET 51-7011.00· ESCO/ISCO 7522

Mason

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read drawings, measure and order material.
Estimate

No public source provides a precise figure. This is our estimate.

16%30%+4.8
Setting out and levels on site.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Raise walls, render and plaster.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Floors, tiling and finishing.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Safety, scaffolding and clearing the bay.
Estimate

No public source provides a precise figure. This is our estimate.

16%10%+1.6
Coordinate with foreman, plumber and electrician.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%15%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • build walls
  • plaster
  • site work
  • Read drawings, measure and order material
  • Setting out and levels on site
  • Raise walls, render and plaster
  • Floors, tiling and finishing
  • Safety, scaffolding and clearing the bay
  • albanil
  • mason

Sources for this job· O*NET 47-2021.00· ESCO/ISCO 7112

Analyse my job

Jobs with similar scores

  1. 499Chimney sweep19%
  2. 500Film director19%
  3. 501Gilder19%
  4. 503Embryologist19%
  5. 504Swimming coach19%
  6. 505Tennis coach19%