Automation index
How much of a Cadastre officer’s job can AI already do?
A plan comes earlier. The plot being the one it is without inflating the value do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Cadastre officer
27%
AI can already do 27% of this job.
#208 / 733
View rankingCadastre officer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plan, the plot and the owner.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Field, the wall and what is not there.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Value, the valuation and not inflating.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Objection, the neighbour and the boundary.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The council, the tax and not dressing it.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it is the one it is, and not inflating the value.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- plots
- cadastre plans
- owners
- boundaries
- valuation papers
- property tax
- objections
- walls
Sources for this job· O*NET 13-2023.00· ESCO/ISCO 2165
IS WORK OVER?
Railway engineer
22%
#389 / 733
View rankingRailway engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Track, geometry and the study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Points, the blade and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
OLE, the height and the gauge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the possession and not leaving the wire wrong.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not derail, and not signing half-done points.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- track geometry
- points
- OLE
- gauge
- possessions
- blades
- railway studies
- not jump to a yes
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142