Automation index
How much of a Calibration technician’s job can AI already do?
A certificate comes earlier. The instrument measuring without signing blind do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Calibration technician
22%
AI can already do 22% of this job.
#383 / 633
View rankingCalibration technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Standard, uncertainty and the certificate.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Instrument, the adjust and the one that will not go.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Field, the one that cannot move and the portable standard.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Lab, the temperature and not skipping the soak.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The client, the rush and not signing blind.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it measures, and a true certificate.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- standards
- uncertainty
- calibration certificates
- adjust
- instruments
- thermal soak
- metrology lab
- the field
Sources for this job· O*NET 17-3028.00· ESCO/ISCO 3111
IS WORK OVER?
Mining engineer
22%
#341 / 633
View rankingMining engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model deposit, blast and rates.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Drawings, permits and mining plans.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Face, safety and ventilation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Plant, contractors and output.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Restoration, waste and regulation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not leaving a miner below.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Model deposit, blast and rates
- Drawings, permits and mining plans
- Face, safety and ventilation
- Plant, contractors and output
- Restoration, waste and regulation
- Not leaving a miner below
- ingeniero de minas
- mining engineer
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146