Automation index
How much of a Calibration technician’s job can AI already do?
A certificate comes earlier. The instrument measuring without signing blind do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Calibration technician
22%
AI can already do 22% of this job.
#383 / 633
View rankingCalibration technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Standard, uncertainty and the certificate.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Instrument, the adjust and the one that will not go.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Field, the one that cannot move and the portable standard.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Lab, the temperature and not skipping the soak.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The client, the rush and not signing blind.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it measures, and a true certificate.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- standards
- uncertainty
- calibration certificates
- adjust
- instruments
- thermal soak
- metrology lab
- the field
Sources for this job· O*NET 17-3028.00· ESCO/ISCO 3111
IS WORK OVER?
Wastewater-plant operator
19%
#519 / 633
View rankingWastewater-plant operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Flow, process and the log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Basin, the sludge and the one that goes.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Breakdown, the pump and at night.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Test, the discharge and not hiding the spike.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The rain, the overflow and not opening extra.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Come out clean, and the sludge in place.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- works flow
- sludge
- basins
- pumps
- discharges
- overflows
- plant logs
- final tests
Sources for this job· O*NET 51-8031.00· ESCO/ISCO 3132