Automation index
How much of a Camera operator’s job can AI already do?
A schedule and an overlay come earlier. The shot you have to nail does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Camera operator
18%
AI can already do 18% of this job.
#686 / 763
View rankingCamera operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Schedule, lists and overlays.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Frame, follow and not lose focus.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Kit, cards and backups.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Director, light and sound.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Knees, shoulder and long days.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not wiping a full card.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Schedule, lists and overlays
- Frame, follow and not lose focus
- Kit, cards and backups
- Director, light and sound
- Knees, shoulder and long days
- Not wiping a full card
- camara
- operador de camara
- camera operator
Sources for this job· O*NET 27-4031.00· ESCO/ISCO 3521
IS WORK OVER?
Geomatics engineer
22%
#412 / 763
View rankingGeomatics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Station, the base and the cloud.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the axis and the one that moved.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Model, the drift and not hiding metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the setting-out and going down to see it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not signing the drift.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the axis is there, and not signing metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- point clouds
- total stations
- axes
- setting-out
- drift
- bases
- geomatics
- the field
Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165