Automation index
How much of a Camera operator’s job can AI already do?
A schedule and an overlay come earlier. The shot you have to nail does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Camera operator
18%
AI can already do 18% of this job.
#666 / 743
View rankingCamera operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Schedule, lists and overlays.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Frame, follow and not lose focus.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Kit, cards and backups.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Director, light and sound.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Knees, shoulder and long days.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not wiping a full card.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Schedule, lists and overlays
- Frame, follow and not lose focus
- Kit, cards and backups
- Director, light and sound
- Knees, shoulder and long days
- Not wiping a full card
- camara
- operador de camara
- camera operator
Sources for this job· O*NET 27-4031.00· ESCO/ISCO 3521
IS WORK OVER?
Geotechnical engineer
22%
#398 / 743
View rankingGeotechnical engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Borehole, the sample and the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the water table and the one that was not read.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Foundations, the clay and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Slope, the factor and not signing the one that slips.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The architect, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
If it stands, sign it. And not hiding the clay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- boreholes
- water table
- clays
- foundations
- slopes
- soil samples
- geotech reports
- factors of safety
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142