Automation index
How much of a Camp counsellor’s job can AI already do?
An activity programme comes earlier. Nobody absconding and coming back whole do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Camp counsellor
19%
AI can already do 19% of this job.
#609 / 743
View rankingCamp counsellor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Programme, groups and the log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Night, the one who cries and the one who absconds.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Activity, the river and not leaving them alone.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Food, allergies and the one who will not eat.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Parents, the call and not hiding the knock.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Come back whole, and not losing anyone.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- camp programmes
- nights
- allergies
- groups
- the river
- logs
- parents
- absconds
Sources for this job· O*NET 39-9032.00· ESCO/ISCO 3423
IS WORK OVER?
Bridge engineer
22%
#391 / 743
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142