Automation index
How much of a Camp counsellor’s job can AI already do?
An activity programme comes earlier. Nobody absconding and coming back whole do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Camp counsellor
19%
AI can already do 19% of this job.
#511 / 633
View rankingCamp counsellor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Programme, groups and the log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Night, the one who cries and the one who absconds.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Activity, the river and not leaving them alone.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Food, allergies and the one who will not eat.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Parents, the call and not hiding the knock.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Come back whole, and not losing anyone.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- camp programmes
- nights
- allergies
- groups
- the river
- logs
- parents
- absconds
Sources for this job· O*NET 39-9032.00· ESCO/ISCO 3423
IS WORK OVER?
Civil engineer
25%
#231 / 633
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142