IS WORK OVER?

Automation index

How much of a Camp counsellor’s job can AI already do?

An activity programme comes earlier. Nobody absconding and coming back whole do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Camp counsellor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Programme, groups and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Night, the one who cries and the one who absconds.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Activity, the river and not leaving them alone.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Food, allergies and the one who will not eat.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Parents, the call and not hiding the knock.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Come back whole, and not losing anyone.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • camp programmes
  • nights
  • allergies
  • groups
  • the river
  • logs
  • parents
  • absconds

Sources for this job· O*NET 39-9032.00· ESCO/ISCO 3423

Geotechnical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Borehole, the sample and the report.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the water table and the one that was not read.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Foundations, the clay and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Slope, the factor and not signing the one that slips.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The architect, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
If it stands, sign it. And not hiding the clay.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • boreholes
  • water table
  • clays
  • foundations
  • slopes
  • soil samples
  • geotech reports
  • factors of safety

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 606Luthier19%
  2. 607Workshop teacher19%
  3. 608Dressmaker19%
  4. 610Ski instructor19%
  5. 611Furniture assembler19%
  6. 612Plasterboard fitter19%