Automation index
How much of a Cardiac surgeon’s job can AI already do?
A bypass sketch comes earlier. Opening the chest and coming off pump do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Cardiac surgeon
18%
AI can already do 18% of this job.
#680 / 753
View rankingCardiac surgeon
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Indication, consent and the plan with cardiology.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Bypass, valve and pump time.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Cannulate, protect the muscle and come off bypass.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Cardiac ICU, bleeding and tamponade.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Follow-up, the wound and the family at the door.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 28% | +3.9 |
On-call, the infarct that does not wait, and the sign-off.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- coronary bypass
- valve surgery
- cardiopulmonary bypass
- open the chest
- cardiac ICU
- tamponade
- cannulate
- myocardial protection
Sources for this job· O*NET 29-1241.00· ESCO/ISCO 2212
IS WORK OVER?
CAD designer
27%
#204 / 753
View rankingCAD designer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, dimensions and the drawing.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Clash, the hit and not leaving it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
List, the material and the one that does not exist.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Change, the revision and not losing the native.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The shop, the doubt and going down to see it.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it can be made, and not leaving the clash.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- 3D models
- dimensions
- clashes
- bills of materials
- revisions
- shop drawings
- natives
- hits
Sources for this job· O*NET 17-3013.00· ESCO/ISCO 3118