Automation index
How much of a Cardiac surgeon’s job can AI already do?
A bypass sketch comes earlier. Opening the chest and coming off pump do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Cardiac surgeon
18%
AI can already do 18% of this job.
#690 / 763
View rankingCardiac surgeon
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Indication, consent and the plan with cardiology.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Bypass, valve and pump time.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Cannulate, protect the muscle and come off bypass.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Cardiac ICU, bleeding and tamponade.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Follow-up, the wound and the family at the door.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 28% | +3.9 |
On-call, the infarct that does not wait, and the sign-off.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- coronary bypass
- valve surgery
- cardiopulmonary bypass
- open the chest
- cardiac ICU
- tamponade
- cannulate
- myocardial protection
Sources for this job· O*NET 29-1241.00· ESCO/ISCO 2212
IS WORK OVER?
Facilities engineer
22%
#401 / 763
View rankingFacilities engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
CMMS, tickets and the PPM.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Roof, the chiller and the one that will not start.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Generator, the diesel and not leaving it dry.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Fire, the pump and the monthly test.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The tenant, August and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That cooling does not die, and not leaving the generator dry.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- CMMS
- PPM
- chillers
- generators
- diesel
- fire pumps
- roofs
- tickets
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149