Automation index
How much of a Cardiac surgeon’s job can AI already do?
A bypass sketch comes earlier. Opening the chest and coming off pump do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Cardiac surgeon
18%
AI can already do 18% of this job.
#570 / 643
View rankingCardiac surgeon
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Indication, consent and the plan with cardiology.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Bypass, valve and pump time.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Cannulate, protect the muscle and come off bypass.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Cardiac ICU, bleeding and tamponade.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Follow-up, the wound and the family at the door.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 28% | +3.9 |
On-call, the infarct that does not wait, and the sign-off.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- coronary bypass
- valve surgery
- cardiopulmonary bypass
- open the chest
- cardiac ICU
- tamponade
- cannulate
- myocardial protection
Sources for this job· O*NET 29-1241.00· ESCO/ISCO 2212
IS WORK OVER?
Industrial engineer
28%
#102 / 643
View rankingIndustrial engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model processes, balances and a first plant layout.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 45% | +9.9 |
Draft procedures, PFDs and operating instructions.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Analyse cost, bottlenecks and OEE from data.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Coordinate suppliers, maintenance and production.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Commissioning and plant trials.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Capex calls and industrial-safety liability.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Commissioning and plant trials
- ingeniero industrial
- industrial engineer
- procesos industriales
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141