Automation index
How much of a Cardiac surgeon’s job can AI already do?
A bypass sketch comes earlier. Opening the chest and coming off pump do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Cardiac surgeon
18%
AI can already do 18% of this job.
#570 / 643
View rankingCardiac surgeon
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Indication, consent and the plan with cardiology.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Bypass, valve and pump time.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Cannulate, protect the muscle and come off bypass.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Cardiac ICU, bleeding and tamponade.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Follow-up, the wound and the family at the door.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 28% | +3.9 |
On-call, the infarct that does not wait, and the sign-off.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- coronary bypass
- valve surgery
- cardiopulmonary bypass
- open the chest
- cardiac ICU
- tamponade
- cannulate
- myocardial protection
Sources for this job· O*NET 29-1241.00· ESCO/ISCO 2212
IS WORK OVER?
Quality engineer
29%
#63 / 643
View rankingQuality engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
FMEA, control plan and the limits.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
8D, claims and the supplier.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Audit, IATF and the awkward finding.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The line, the defect and stop or not.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
APQP, PPAP and the customer launch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Release with judgement, and not hiding the PPM.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- FMEA
- 8D
- control plan
- IATF
- PPAP
- APQP
- supplier claims
- release batches
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141