IS WORK OVER?

Automation index

How much of a Carpenter’s job can AI already do?

Today an AI or a robot can hardly do this job for you. The site, the surprises, and the code are settled on the ground.

This percentage does not predict how many people will lose their jobs.

Task comparison

Carpenter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Follow established safety rules and regulations and maintain a safe and clean environment.
Estimate

No public source provides a precise figure. This is our estimate.

9%28%+2.5
Measure and mark cutting lines on materials, using a ruler, pencil, chalk, and marking gauge.
Estimate

No public source provides a precise figure. This is our estimate.

9%28%+2.5
Shape or cut materials to specified measurements, using hand tools, machines, or power saws.
Estimate

No public source provides a precise figure. This is our estimate.

8%28%+2.2
Assemble and fasten materials to make frameworks or props, using hand tools and wood screws, nails, dowel pins, or glue.
Estimate

No public source provides a precise figure. This is our estimate.

7%28%+2
Build or repair cabinets, doors, frameworks, floors, or other wooden fixtures used in buildings, using woodworking machines, carpenter's hand tools, or power tools.
Estimate

No public source provides a precise figure. This is our estimate.

6%12%+0.7
Study specifications in blueprints, sketches, or building plans to prepare project layout and determine dimensions and materials required.
Estimate

No public source provides a precise figure. This is our estimate.

6%28%+1.7
Install structures or fixtures, such as windows, frames, floorings, trim, or hardware, using carpenters' hand or power tools.
Estimate

No public source provides a precise figure. This is our estimate.

5%28%+1.4
Verify trueness of structure, using plumb bob and level.
Estimate

No public source provides a precise figure. This is our estimate.

5%28%+1.4
Other less frequent tasks (weight estimated from frequency).
Estimate

No public source provides a precise figure. This is our estimate.

45%28%+12.6
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • install locks
  • work ergonomically
  • apply proofing membranes
  • cut insulation material to size
  • use shims
  • inspect construction supplies
  • manipulate glass
  • use measurement instruments
  • apply insulation strips
  • use safety equipment in construction

Sources for this job· O*NET 47-2031.00· ESCO/ISCO 7115

Cabin manager

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Briefing, door assignment and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Cabin, the difficult passenger and turbulence.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Service, allergies and the one who is ill.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Safety, the demo and the kit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Delay, overbooking and the one who will not sit.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Evacuate for real, and sign the cabin.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • cabin briefing
  • assign doors
  • difficult passenger
  • safety demo
  • onboard allergies
  • overbooking
  • evacuate
  • turbulence

Sources for this job· O*NET 53-2031.00· ESCO/ISCO 5111

Analyse my job

Jobs with similar scores

  1. 134Astronomer27%
  2. 135Banker27%
  3. 136Bid manager27%
  4. 138Category manager27%
  5. 139Research scientist27%
  6. 140Climatologist27%