Automation index
How much of a Carpenter’s job can AI already do?
Today an AI or a robot can hardly do this job for you. The site, the surprises, and the code are settled on the ground.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Carpenter
27%
AI can already do 27% of this job.
#137 / 633
View rankingCarpenter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Follow established safety rules and regulations and maintain a safe and clean environment.EstimateNo public source provides a precise figure. This is our estimate. | 9% | 28% | +2.5 |
Measure and mark cutting lines on materials, using a ruler, pencil, chalk, and marking gauge.EstimateNo public source provides a precise figure. This is our estimate. | 9% | 28% | +2.5 |
Shape or cut materials to specified measurements, using hand tools, machines, or power saws.EstimateNo public source provides a precise figure. This is our estimate. | 8% | 28% | +2.2 |
Assemble and fasten materials to make frameworks or props, using hand tools and wood screws, nails, dowel pins, or glue.EstimateNo public source provides a precise figure. This is our estimate. | 7% | 28% | +2 |
Build or repair cabinets, doors, frameworks, floors, or other wooden fixtures used in buildings, using woodworking machines, carpenter's hand tools, or power tools.EstimateNo public source provides a precise figure. This is our estimate. | 6% | 12% | +0.7 |
Study specifications in blueprints, sketches, or building plans to prepare project layout and determine dimensions and materials required.EstimateNo public source provides a precise figure. This is our estimate. | 6% | 28% | +1.7 |
Install structures or fixtures, such as windows, frames, floorings, trim, or hardware, using carpenters' hand or power tools.EstimateNo public source provides a precise figure. This is our estimate. | 5% | 28% | +1.4 |
Verify trueness of structure, using plumb bob and level.EstimateNo public source provides a precise figure. This is our estimate. | 5% | 28% | +1.4 |
Other less frequent tasks (weight estimated from frequency).EstimateNo public source provides a precise figure. This is our estimate. | 45% | 28% | +12.6 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- install locks
- work ergonomically
- apply proofing membranes
- cut insulation material to size
- use shims
- inspect construction supplies
- manipulate glass
- use measurement instruments
- apply insulation strips
- use safety equipment in construction
Sources for this job· O*NET 47-2031.00· ESCO/ISCO 7115
IS WORK OVER?
Mason
15%
#617 / 633
View rankingMason
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read drawings, measure and order material.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 30% | +4.8 |
Setting out and levels on site.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Raise walls, render and plaster.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Floors, tiling and finishing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Safety, scaffolding and clearing the bay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 10% | +1.6 |
Coordinate with foreman, plumber and electrician.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
| Total | 100% | 15% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- build walls
- plaster
- site work
- Read drawings, measure and order material
- Setting out and levels on site
- Raise walls, render and plaster
- Floors, tiling and finishing
- Safety, scaffolding and clearing the bay
- albanil
- mason
Sources for this job· O*NET 47-2021.00· ESCO/ISCO 7112