Automation index
How much of a Carpenter’s job can AI already do?
Today an AI or a robot can hardly do this job for you. The site, the surprises, and the code are settled on the ground.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Carpenter
27%
AI can already do 27% of this job.
#137 / 623
View rankingCarpenter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Follow established safety rules and regulations and maintain a safe and clean environment.EstimateNo public source provides a precise figure. This is our estimate. | 9% | 28% | +2.5 |
Measure and mark cutting lines on materials, using a ruler, pencil, chalk, and marking gauge.EstimateNo public source provides a precise figure. This is our estimate. | 9% | 28% | +2.5 |
Shape or cut materials to specified measurements, using hand tools, machines, or power saws.EstimateNo public source provides a precise figure. This is our estimate. | 8% | 28% | +2.2 |
Assemble and fasten materials to make frameworks or props, using hand tools and wood screws, nails, dowel pins, or glue.EstimateNo public source provides a precise figure. This is our estimate. | 7% | 28% | +2 |
Build or repair cabinets, doors, frameworks, floors, or other wooden fixtures used in buildings, using woodworking machines, carpenter's hand tools, or power tools.EstimateNo public source provides a precise figure. This is our estimate. | 6% | 12% | +0.7 |
Study specifications in blueprints, sketches, or building plans to prepare project layout and determine dimensions and materials required.EstimateNo public source provides a precise figure. This is our estimate. | 6% | 28% | +1.7 |
Install structures or fixtures, such as windows, frames, floorings, trim, or hardware, using carpenters' hand or power tools.EstimateNo public source provides a precise figure. This is our estimate. | 5% | 28% | +1.4 |
Verify trueness of structure, using plumb bob and level.EstimateNo public source provides a precise figure. This is our estimate. | 5% | 28% | +1.4 |
Other less frequent tasks (weight estimated from frequency).EstimateNo public source provides a precise figure. This is our estimate. | 45% | 28% | +12.6 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- install locks
- work ergonomically
- apply proofing membranes
- cut insulation material to size
- use shims
- inspect construction supplies
- manipulate glass
- use measurement instruments
- apply insulation strips
- use safety equipment in construction
Sources for this job· O*NET 47-2031.00· ESCO/ISCO 7115
IS WORK OVER?
NGO programme officer
26%
#213 / 623
View rankingNGO programme officer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Design, indicators and the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 48% | +7.7 |
Justify, invoices and the donor.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Field or neighbourhood and what does not fit the frame.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Partners, meetings and coordination.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The surprise, the cut and redoing the timetable.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it works, and not inflating the indicator.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- design projects
- justify to donors
- indicators
- activity report
- coordinate partners
- timetable
- project invoices
- neighbourhood work
Sources for this job· O*NET 21-1093.00· ESCO/ISCO 2635