Automation index
How much of a Ceramicist’s job can AI already do?
A firing curve comes earlier. Glazing without losing the batch in the firing do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Ceramicist
19%
AI can already do 19% of this job.
#484 / 633
View rankingCeramicist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Body, mould and the curve.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Glaze, apply and the one that runs.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Kiln, atmosphere and the batch that sticks.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Run, the order and the one that does not match.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The gallery, the deadline and not opening the kiln early.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Not losing the batch, and signing the curve.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- firing curves
- bodies
- ceramic moulds
- glazes
- atmosphere
- runs
- runs of glaze
- the firing
Sources for this job· O*NET 51-9195.00· ESCO/ISCO 7314
IS WORK OVER?
Renewables engineer
27%
#163 / 633
View rankingRenewables engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Resource, layout and the yield model.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Site, topography and the cable that will not reach.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Permits, grid point and the TSO.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
EPC, commissioning and export tests.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The neighbour, the council and the appeal against the plant.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it exports, and not inflating equivalent hours.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- plant layout
- solar resource
- grid connection
- commissioning
- renewables permits
- yield model
- export tests
- EPC
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149