Automation index
How much of a Ceramicist’s job can AI already do?
A firing curve comes earlier. Glazing without losing the batch in the firing do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Ceramicist
19%
AI can already do 19% of this job.
#493 / 643
View rankingCeramicist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Body, mould and the curve.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Glaze, apply and the one that runs.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Kiln, atmosphere and the batch that sticks.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Run, the order and the one that does not match.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The gallery, the deadline and not opening the kiln early.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Not losing the batch, and signing the curve.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- firing curves
- bodies
- ceramic moulds
- glazes
- atmosphere
- runs
- runs of glaze
- the firing
Sources for this job· O*NET 51-9195.00· ESCO/ISCO 7314
IS WORK OVER?
Tower crane operator
18%
#583 / 643
View rankingTower crane operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Radius, winds and the day’s log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Hoist, trolley and the slinger’s call.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Erect, climb and the base that is checked.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Two-crane lifts and crossing jibs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The wind that gets up and stopping in time.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Sweep nobody, and not pushing the radius.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tower-crane lifts
- load charts
- climb the crane
- slinger’s call
- jib wind
- crossing jibs
- crane base
- trolley
Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343