Automation index
How much of a Cheesemaker’s job can AI already do?
A recipe and a pH come earlier. Setting, turning and signing the ageing do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Cheesemaker
22%
AI can already do 22% of this job.
#443 / 733
View rankingCheesemaker
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Milk, pH and the day’s recipe.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Set, cut and the drain.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Turn, salt and the ageing room.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Taste, the batch and the one that splits.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The co-op, the season and not selling too early.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Sign the ageing, and not forcing the pH.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- set curd
- drain whey
- turn cheeses
- ageing room
- milk pH
- salt
- taste batches
- cheese recipe
Sources for this job· O*NET 51-3092.00· ESCO/ISCO 7513
IS WORK OVER?
Railway engineer
22%
#389 / 733
View rankingRailway engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Track, geometry and the study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Points, the blade and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
OLE, the height and the gauge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the possession and not leaving the wire wrong.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not derail, and not signing half-done points.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- track geometry
- points
- OLE
- gauge
- possessions
- blades
- railway studies
- not jump to a yes
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142