IS WORK OVER?

Automation index

How much of a Chemical engineer’s job can AI already do?

A balance and a simulation come earlier. Starting a plant and not leaking anything do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Chemical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Balances, simulation and sizing.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
P&IDs, specs and equipment lists.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Plant, operators and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Safety, HAZOP and discharges.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Quality, standards and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign a process that will not explode.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Balances, simulation and sizing
  • P&IDs, specs and equipment lists
  • Plant, operators and commissioning
  • Safety, HAZOP and discharges
  • Quality, standards and documentation
  • Sign a process that will not explode
  • ingeniero quimico
  • chemical engineer

Sources for this job· O*NET 17-2041.00· ESCO/ISCO 2145

Electoral officer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Roll, additions and the one who is not there.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Station, the chair and the kit.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Polling day, the incident and the one who protests.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Count, the minute and not jumping a result.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The board, the complaint and not losing the box.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the right one votes, and not losing the box.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • electoral roll
  • stations
  • ballot boxes
  • the count
  • minutes
  • incidents
  • polling day
  • roll additions

Sources for this job· O*NET 13-1199.00· ESCO/ISCO 3359

Analyse my job

Jobs with similar scores

  1. 269Geological engineer25%
  2. 270Mechanical engineer25%
  3. 271Naval architect25%
  4. 273Interior designer25%
  5. 274Brewer25%
  6. 275Tool and die maker25%