IS WORK OVER?

Automation index

How much of a Chemical engineer’s job can AI already do?

A balance and a simulation come earlier. Starting a plant and not leaking anything do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Chemical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Balances, simulation and sizing.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
P&IDs, specs and equipment lists.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Plant, operators and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Safety, HAZOP and discharges.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Quality, standards and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign a process that will not explode.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Balances, simulation and sizing
  • P&IDs, specs and equipment lists
  • Plant, operators and commissioning
  • Safety, HAZOP and discharges
  • Quality, standards and documentation
  • Sign a process that will not explode
  • ingeniero quimico
  • chemical engineer

Sources for this job· O*NET 17-2041.00· ESCO/ISCO 2145

HVAC engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Loads, flows and the plant.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Works, the duct and the one they crushed.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Commissioning, the balance and the room that sweats.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Noise, the grille and not leaving the whistle.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the saving and not killing the fresh air.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it does not sweat, and not oversizing.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • load calcs
  • air flows
  • ducts
  • balancing
  • grilles
  • fresh air
  • whistles
  • HVAC plant

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 277Geological engineer25%
  2. 278Mechanical engineer25%
  3. 279Naval architect25%
  4. 281Interior designer25%
  5. 282Brewer25%
  6. 283Tool and die maker25%