IS WORK OVER?

Automation index

How much of a Chemical engineer’s job can AI already do?

A balance and a simulation come earlier. Starting a plant and not leaking anything do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Chemical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Balances, simulation and sizing.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
P&IDs, specs and equipment lists.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Plant, operators and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Safety, HAZOP and discharges.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Quality, standards and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign a process that will not explode.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Balances, simulation and sizing
  • P&IDs, specs and equipment lists
  • Plant, operators and commissioning
  • Safety, HAZOP and discharges
  • Quality, standards and documentation
  • Sign a process that will not explode
  • ingeniero quimico
  • chemical engineer

Sources for this job· O*NET 17-2041.00· ESCO/ISCO 2145

Hydrologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Hydrograph, catchment and the model.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, gauging and the one that does not read.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Flood, the alert and not delaying.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Low flow, irrigation and the clash.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The authority, the figure and not dressing the flow.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
If the river rises, call it.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • hydrographs
  • catchments
  • gauging
  • floods
  • low flow
  • hydrology alerts
  • flows
  • the river authority

Sources for this job· O*NET 19-2043.00· ESCO/ISCO 2114

Analyse my job

Jobs with similar scores

  1. 238Geological engineer25%
  2. 239Mechanical engineer25%
  3. 240Naval architect25%
  4. 242Interior designer25%
  5. 243Brewer25%
  6. 244Tool and die maker25%