Automation index
How much of a Chemical engineer’s job can AI already do?
A balance and a simulation come earlier. Starting a plant and not leaking anything do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Chemical engineer
25%
AI can already do 25% of this job.
#241 / 633
View rankingChemical engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Balances, simulation and sizing.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
P&IDs, specs and equipment lists.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Plant, operators and commissioning.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Safety, HAZOP and discharges.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Quality, standards and documentation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign a process that will not explode.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Balances, simulation and sizing
- P&IDs, specs and equipment lists
- Plant, operators and commissioning
- Safety, HAZOP and discharges
- Quality, standards and documentation
- Sign a process that will not explode
- ingeniero quimico
- chemical engineer
Sources for this job· O*NET 17-2041.00· ESCO/ISCO 2145
IS WORK OVER?
Intensivist
20%
#455 / 633
View rankingIntensivist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Protocols, scores and the on-call plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Airway, vasopressors and the patient who crashes.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Ventilation, balances and taking the tube out.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Bedside ultrasound and ICU procedures.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Family, limits and the yes or no to admission.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
On-call, the error and owning the bed.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- intubate
- ICU ventilation
- vasopressors
- difficult airway
- bedside ultrasound
- limit treatment
- ICU scores
- extubate
Sources for this job· O*NET 29-1229.00· ESCO/ISCO 2212