IS WORK OVER?

Automation index

How much of a Chemical engineer’s job can AI already do?

A balance and a simulation come earlier. Starting a plant and not leaking anything do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Chemical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Balances, simulation and sizing.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
P&IDs, specs and equipment lists.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Plant, operators and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Safety, HAZOP and discharges.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Quality, standards and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign a process that will not explode.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Balances, simulation and sizing
  • P&IDs, specs and equipment lists
  • Plant, operators and commissioning
  • Safety, HAZOP and discharges
  • Quality, standards and documentation
  • Sign a process that will not explode
  • ingeniero quimico
  • chemical engineer

Sources for this job· O*NET 17-2041.00· ESCO/ISCO 2145

Kayak guide

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Flow, kit and the briefing.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Water, the novice and the one who flips.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Rescue, the rope and not losing anyone.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Rapid, the yes or no and aborting.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The cold, the wetsuit and not pushing the grade.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Without flipping the group, and whole to the take-out.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • flow
  • river rescue
  • rapids
  • wetsuit
  • kayak novices
  • rope
  • river briefing
  • flip

Sources for this job· O*NET 39-7011.00· ESCO/ISCO 5113

Analyse my job

Jobs with similar scores

  1. 238Geological engineer25%
  2. 239Mechanical engineer25%
  3. 240Naval architect25%
  4. 242Interior designer25%
  5. 243Brewer25%
  6. 244Tool and die maker25%