IS WORK OVER?

Automation index

How much of a Chemical engineer’s job can AI already do?

A balance and a simulation come earlier. Starting a plant and not leaking anything do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Chemical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Balances, simulation and sizing.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
P&IDs, specs and equipment lists.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Plant, operators and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Safety, HAZOP and discharges.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Quality, standards and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign a process that will not explode.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Balances, simulation and sizing
  • P&IDs, specs and equipment lists
  • Plant, operators and commissioning
  • Safety, HAZOP and discharges
  • Quality, standards and documentation
  • Sign a process that will not explode
  • ingeniero quimico
  • chemical engineer

Sources for this job· O*NET 17-2041.00· ESCO/ISCO 2145

Metrology technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Program, CMM and the part.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Measure, the stylus and the one that will not reach.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Report, GD&T and not dressing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Room, the temperature and the soak.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The shop, the rush and not leaving the part dirty.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
A true dimension, and a clean report.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • CMM
  • GD&T
  • stylus
  • measurement programs
  • metrology room
  • dimensions
  • dimensional reports
  • soak

Sources for this job· O*NET 17-3028.00· ESCO/ISCO 3111

Analyse my job

Jobs with similar scores

  1. 243Geological engineer25%
  2. 244Mechanical engineer25%
  3. 245Naval architect25%
  4. 247Interior designer25%
  5. 248Brewer25%
  6. 249Tool and die maker25%