IS WORK OVER?

Automation index

How much of a Chemical engineer’s job can AI already do?

A balance and a simulation come earlier. Starting a plant and not leaking anything do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Chemical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Balances, simulation and sizing.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
P&IDs, specs and equipment lists.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Plant, operators and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Safety, HAZOP and discharges.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Quality, standards and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign a process that will not explode.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Balances, simulation and sizing
  • P&IDs, specs and equipment lists
  • Plant, operators and commissioning
  • Safety, HAZOP and discharges
  • Quality, standards and documentation
  • Sign a process that will not explode
  • ingeniero quimico
  • chemical engineer

Sources for this job· O*NET 17-2041.00· ESCO/ISCO 2145

Safety engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
HAZOP, nodes and the minute.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Plant, the scenario and the one that was not thought.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
SIL, the valve and not jumping it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Incident, the lesson and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Management, the cost and not yielding the interlock.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Stop, and not signing the risk that kills.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • HAZOP
  • nodes
  • SIL
  • safety valves
  • incidents
  • interlocks
  • safety minutes
  • not jump

Sources for this job· O*NET 17-2111.00· ESCO/ISCO 2141

Analyse my job

Jobs with similar scores

  1. 272Geological engineer25%
  2. 273Mechanical engineer25%
  3. 274Naval architect25%
  4. 276Interior designer25%
  5. 277Brewer25%
  6. 278Tool and die maker25%