IS WORK OVER?

Automation index

How much of a Chemical engineer’s job can AI already do?

A balance and a simulation come earlier. Starting a plant and not leaking anything do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Chemical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Balances, simulation and sizing.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
P&IDs, specs and equipment lists.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Plant, operators and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Safety, HAZOP and discharges.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Quality, standards and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign a process that will not explode.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Balances, simulation and sizing
  • P&IDs, specs and equipment lists
  • Plant, operators and commissioning
  • Safety, HAZOP and discharges
  • Quality, standards and documentation
  • Sign a process that will not explode
  • ingeniero quimico
  • chemical engineer

Sources for this job· O*NET 17-2041.00· ESCO/ISCO 2145

Scrum master

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Facilitate ceremonies, boards and notes.
Estimate

No public source provides a precise figure. This is our estimate.

20%45%+9
Flow metrics and impediment reports.
Estimate

No public source provides a precise figure. This is our estimate.

16%38%+6.1
Team coaching and internal conflict.
Estimate

No public source provides a precise figure. This is our estimate.

18%15%+2.7
Protect the sprint from interruptions.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Train PO and managers in the method.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Change the system, not just the ritual.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Facilitate ceremonies, boards and notes
  • Flow metrics and impediment reports
  • Team coaching and internal conflict
  • Protect the sprint from interruptions
  • Train PO and managers in the method
  • Change the system, not just the ritual
  • scrum master
  • agile coach

Sources for this job· O*NET 13-1111.00· ESCO/ISCO 2421

Analyse my job

Jobs with similar scores

  1. 238Geological engineer25%
  2. 239Mechanical engineer25%
  3. 240Naval architect25%
  4. 242Interior designer25%
  5. 243Brewer25%
  6. 244Tool and die maker25%