IS WORK OVER?

Automation index

How much of a Chemical engineer’s job can AI already do?

A balance and a simulation come earlier. Starting a plant and not leaking anything do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Chemical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Balances, simulation and sizing.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
P&IDs, specs and equipment lists.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Plant, operators and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Safety, HAZOP and discharges.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Quality, standards and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign a process that will not explode.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Balances, simulation and sizing
  • P&IDs, specs and equipment lists
  • Plant, operators and commissioning
  • Safety, HAZOP and discharges
  • Quality, standards and documentation
  • Sign a process that will not explode
  • ingeniero quimico
  • chemical engineer

Sources for this job· O*NET 17-2041.00· ESCO/ISCO 2145

Transplant coordinator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Alert, the donor and the protocol.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
ICU, brain death and the one who doubts.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Family, three in the morning and not pushing.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Logistics, the retrieval team and the plane.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Theatre, the ischaemia time and not losing the organ.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Talk to the family, and not pushing.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • donors
  • brain death
  • family consent
  • retrieval teams
  • ischaemia time
  • ICU
  • organ logistics
  • not push

Sources for this job· O*NET 29-1141.00· ESCO/ISCO 2269

Analyse my job

Jobs with similar scores

  1. 244Geological engineer25%
  2. 245Mechanical engineer25%
  3. 246Naval architect25%
  4. 248Interior designer25%
  5. 249Brewer25%
  6. 250Tool and die maker25%