Automation index
How much of a Chemist’s job can AI already do?
A protocol and a batch report come earlier. The smell of a reaction, and signing a certificate, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Chemist
26%
AI can already do 26% of this job.
#245 / 743
View rankingChemist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Protocols, calcs and safety sheets.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 45% | +9 |
Batch reports, charts and docs.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Synthesis, titration and sample handling.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 15% | +2.7 |
Read a strange result and repeat it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Plant safety and waste.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
Sign quality and talk to production.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Protocols, calcs and safety sheets
- Batch reports, charts and docs
- Synthesis, titration and sample handling
- Read a strange result and repeat it
- Plant safety and waste
- Sign quality and talk to production
- quimico
- chemist
- laboratorio quimico
Sources for this job· O*NET 19-2031.00· ESCO/ISCO 2113
IS WORK OVER?
Cost engineer
27%
#173 / 743
View rankingCost engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Measure, rates and the budget.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Works, the variance and the one that was not logged.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Change, the extra and not giving it away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Close, the dispute and not inflating.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Management, the bid and not selling the reckless one.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
The real number, and not the reckless bid.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- measures
- unit rates
- variances
- extras
- disputes
- reckless bids
- works budgets
- closes
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142