Automation index
How much of a Chemist’s job can AI already do?
A protocol and a batch report come earlier. The smell of a reaction, and signing a certificate, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Chemist
26%
AI can already do 26% of this job.
#209 / 633
View rankingChemist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Protocols, calcs and safety sheets.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 45% | +9 |
Batch reports, charts and docs.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Synthesis, titration and sample handling.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 15% | +2.7 |
Read a strange result and repeat it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Plant safety and waste.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
Sign quality and talk to production.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Protocols, calcs and safety sheets
- Batch reports, charts and docs
- Synthesis, titration and sample handling
- Read a strange result and repeat it
- Plant safety and waste
- Sign quality and talk to production
- quimico
- chemist
- laboratorio quimico
Sources for this job· O*NET 19-2031.00· ESCO/ISCO 2113
IS WORK OVER?
Electrician
24%↑
#265 / 633
View rankingElectrician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Use a variety of tools or equipment, such as power construction equipment, measuring devices, power tools, and testing equipment, such as oscilloscopes, ammeters, or test lamps.EstimateNo public source provides a precise figure. This is our estimate. | 10% | 28% | +2.8 |
Work from ladders, scaffolds, or roofs to install, maintain, or repair electrical wiring, equipment, or fixtures.EstimateNo public source provides a precise figure. This is our estimate. | 10% | 12% | +1.2 |
Prepare sketches or follow blueprints to determine the location of wiring or equipment and to ensure conformance to building and safety codes.EstimateNo public source provides a precise figure. This is our estimate. | 8% | 28% | +2.2 |
Assemble, install, test, or maintain electrical or electronic wiring, equipment, appliances, apparatus, or fixtures, using hand tools or power tools.EstimateNo public source provides a precise figure. This is our estimate. | 8% | 28% | +2.2 |
Place conduit, pipes, or tubing, inside designated partitions, walls, or other concealed areas, and pull insulated wires or cables through the conduit to complete circuits between boxes.EstimateNo public source provides a precise figure. This is our estimate. | 8% | 28% | +2.2 |
Direct or train workers to install, maintain, or repair electrical wiring, equipment, or fixtures.EstimateNo public source provides a precise figure. This is our estimate. | 6% | 12% | +0.7 |
Inspect electrical systems, equipment, or components to identify hazards, defects, or the need for adjustment or repair, and to ensure compliance with codes.EstimateNo public source provides a precise figure. This is our estimate. | 5% | 12% | +0.6 |
Perform physically demanding tasks, such as digging trenches to lay conduit or moving or lifting heavy objects.EstimateNo public source provides a precise figure. This is our estimate. | 5% | 12% | +0.6 |
Other less frequent tasks (weight estimated from frequency).EstimateNo public source provides a precise figure. This is our estimate. | 40% | 28% | +11.2 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- install wiring
- electrical panels
- repair faults
- building systems monitoring technology
- electricity
- work ergonomically
- resolve equipment malfunctions
- inspect electrical supplies
- splice cable
- inspect construction supplies
Sources for this job· O*NET 47-2111.00· ESCO/ISCO 7411