Automation index
How much of a Chimney sweep’s job can AI already do?
A inspection protocol comes earlier. Climbing, cleaning and not setting the soot on fire do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Chimney sweep
19%
AI can already do 19% of this job.
#490 / 633
View rankingChimney sweep
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Inspection, camera and the flue report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Climb, sweep and the nest that blocks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Tightness, draught and the one that will not draw.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Certificate, rules and the residents.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The wet roof and not falling.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Clean for real, and not leaving loose soot.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- sweep chimneys
- flue camera
- draught
- flue certificate
- nests
- roofs
- tightness
- soot
Sources for this job· O*NET 47-4071.00· ESCO/ISCO 7133
IS WORK OVER?
Cloud architect
28%
#82 / 633
View rankingCloud architect
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Diagrams, ADRs and a first IaC pass.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 48% | +10.6 |
Cost estimate, Well-Architected and gaps.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Review PRs, security and network.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 20% | +3.2 |
Align with security, finops and product.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
PoCs, real failures and vendor limits.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Sign the design and own the incident.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- building plans
- renders
- sign a project
- Diagrams, ADRs and a first IaC pass
- Cost estimate, Well-Architected and gaps
- Review PRs, security and network
- Align with security, finops and product
- PoCs, real failures and vendor limits
- Sign the design and own the incident
- arquitecto cloud
Sources for this job· O*NET 15-1243.01· ESCO/ISCO 2511