IS WORK OVER?

Automation index

How much of a Chimney sweep’s job can AI already do?

A inspection protocol comes earlier. Climbing, cleaning and not setting the soot on fire do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Chimney sweep

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Inspection, camera and the flue report.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Climb, sweep and the nest that blocks.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Tightness, draught and the one that will not draw.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Certificate, rules and the residents.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The wet roof and not falling.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Clean for real, and not leaving loose soot.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • sweep chimneys
  • flue camera
  • draught
  • flue certificate
  • nests
  • roofs
  • tightness
  • soot

Sources for this job· O*NET 47-4071.00· ESCO/ISCO 7133

Game designer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
GDD, flows and economy tables.
Estimate

No public source provides a precise figure. This is our estimate.

22%48%+10.6
Leveling, quests and tutorial copy.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Playtest, telemetry and reading frustration.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Align art, engineering and production.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Cut systems and defend the feel.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Decide what the game is, and is not.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • design interfaces
  • prototypes
  • figma
  • GDD, flows and economy tables
  • Leveling, quests and tutorial copy
  • Align art, engineering and production
  • Cut systems and defend the feel
  • Decide what the game is, and is not
  • game designer
  • diseñador de videojuegos

Sources for this job· O*NET 15-1255.00· ESCO/ISCO 2166

Analyse my job

Jobs with similar scores

  1. 496Tram driver19%
  2. 497Ham carver19%
  3. 498Zookeeper19%
  4. 500Film director19%
  5. 501Gilder19%
  6. 502Cabinetmaker19%