IS WORK OVER?

Automation index

How much of a Chimney sweep’s job can AI already do?

A inspection protocol comes earlier. Climbing, cleaning and not setting the soot on fire do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Chimney sweep

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Inspection, camera and the flue report.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Climb, sweep and the nest that blocks.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Tightness, draught and the one that will not draw.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Certificate, rules and the residents.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The wet roof and not falling.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Clean for real, and not leaving loose soot.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • sweep chimneys
  • flue camera
  • draught
  • flue certificate
  • nests
  • roofs
  • tightness
  • soot

Sources for this job· O*NET 47-4071.00· ESCO/ISCO 7133

Industrial engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model processes, balances and a first plant layout.
Estimate

No public source provides a precise figure. This is our estimate.

22%45%+9.9
Draft procedures, PFDs and operating instructions.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Analyse cost, bottlenecks and OEE from data.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Coordinate suppliers, maintenance and production.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Commissioning and plant trials.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Capex calls and industrial-safety liability.
Estimate

No public source provides a precise figure. This is our estimate.

12%10%+1.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Commissioning and plant trials
  • ingeniero industrial
  • industrial engineer
  • procesos industriales

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Analyse my job

Jobs with similar scores

  1. 496Tram driver19%
  2. 497Ham carver19%
  3. 498Zookeeper19%
  4. 500Film director19%
  5. 501Gilder19%
  6. 502Cabinetmaker19%