Automation index
How much of a Chimney sweep’s job can AI already do?
A inspection protocol comes earlier. Climbing, cleaning and not setting the soot on fire do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Chimney sweep
19%
AI can already do 19% of this job.
#499 / 643
View rankingChimney sweep
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Inspection, camera and the flue report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Climb, sweep and the nest that blocks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Tightness, draught and the one that will not draw.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Certificate, rules and the residents.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The wet roof and not falling.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Clean for real, and not leaving loose soot.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- sweep chimneys
- flue camera
- draught
- flue certificate
- nests
- roofs
- tightness
- soot
Sources for this job· O*NET 47-4071.00· ESCO/ISCO 7133
IS WORK OVER?
Maintenance technician
22%
#398 / 643
View rankingMaintenance technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
CMMS, history and spare orders.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Procedures, written LOTO and logs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Diagnose, strip and repair.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 12% | +2.4 |
Field preventative and measurements.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
On-call, shutdowns and production pressure.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
Safety, permits and not leaving the plant down.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- CMMS, history and spare orders
- Procedures, written LOTO and logs
- Diagnose, strip and repair
- Field preventative and measurements
- On-call, shutdowns and production pressure
- tecnico de mantenimiento
- maintenance technician
- mantenimiento industrial
Sources for this job· O*NET 49-9041.00· ESCO/ISCO 3115