Automation index
How much of a Chimney sweep’s job can AI already do?
A inspection protocol comes earlier. Climbing, cleaning and not setting the soot on fire do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Chimney sweep
19%
AI can already do 19% of this job.
#490 / 633
View rankingChimney sweep
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Inspection, camera and the flue report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Climb, sweep and the nest that blocks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Tightness, draught and the one that will not draw.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Certificate, rules and the residents.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The wet roof and not falling.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Clean for real, and not leaving loose soot.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- sweep chimneys
- flue camera
- draught
- flue certificate
- nests
- roofs
- tightness
- soot
Sources for this job· O*NET 47-4071.00· ESCO/ISCO 7133
IS WORK OVER?
Power-plant operator
19%
#517 / 633
View rankingPower-plant operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Set-point, parameters and the log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Room, alarms and the one that trips.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Start, stop and not skipping the SOP.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Maintenance, isolation and the permit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The peak, the grid and not forcing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
The set-point, and not tripping.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- set-points
- control room
- plant SOP
- starts
- isolations
- alarms
- dispatch
- the grid
Sources for this job· O*NET 51-8013.00· ESCO/ISCO 3131