Automation index
How much of a Chimney sweep’s job can AI already do?
A inspection protocol comes earlier. Climbing, cleaning and not setting the soot on fire do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Chimney sweep
19%
AI can already do 19% of this job.
#490 / 633
View rankingChimney sweep
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Inspection, camera and the flue report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Climb, sweep and the nest that blocks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Tightness, draught and the one that will not draw.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Certificate, rules and the residents.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The wet roof and not falling.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Clean for real, and not leaving loose soot.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- sweep chimneys
- flue camera
- draught
- flue certificate
- nests
- roofs
- tightness
- soot
Sources for this job· O*NET 47-4071.00· ESCO/ISCO 7133
IS WORK OVER?
Renewables engineer
27%
#163 / 633
View rankingRenewables engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Resource, layout and the yield model.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Site, topography and the cable that will not reach.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Permits, grid point and the TSO.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
EPC, commissioning and export tests.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The neighbour, the council and the appeal against the plant.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it exports, and not inflating equivalent hours.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- plant layout
- solar resource
- grid connection
- commissioning
- renewables permits
- yield model
- export tests
- EPC
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149