Automation index
How much of a Chiropractor’s job can AI already do?
A film and a report come earlier. The adjustment, and not hurting the neck, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Chiropractor
20%
AI can already do 20% of this job.
#475 / 643
View rankingChiropractor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
History, films and a first plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Adjustment, mobilisation and spinal work.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Explain, dose and watch red flags.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Notes, consents and progress.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Room, hygiene and follow-up.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not over-adjusting or treating the wrong person.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- History, films and a first plan
- Adjustment, mobilisation and spinal work
- Explain, dose and watch red flags
- Notes, consents and progress
- Room, hygiene and follow-up
- quiropractico
- chiropractor
Sources for this job· O*NET 29-1011.00· ESCO/ISCO 2269
IS WORK OVER?
Tower crane operator
18%
#583 / 643
View rankingTower crane operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Radius, winds and the day’s log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Hoist, trolley and the slinger’s call.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Erect, climb and the base that is checked.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Two-crane lifts and crossing jibs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The wind that gets up and stopping in time.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Sweep nobody, and not pushing the radius.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tower-crane lifts
- load charts
- climb the crane
- slinger’s call
- jib wind
- crossing jibs
- crane base
- trolley
Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343