IS WORK OVER?

Automation index

How much of a Chocolatier’s job can AI already do?

A temper curve comes earlier. Snap without blooming do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Chocolatier

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Temper, recipes and the mould.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Bonbon, filling and the one that will not set.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Display, orders and summer heat.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Cocoa, traceability and origin.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Christmas, the volume and not losing the snap.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it snaps, and not going white.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • temper chocolate
  • bonbons
  • moulds
  • fillings
  • bloom
  • Christmas orders
  • cocoa origin
  • the display

Sources for this job· O*NET 51-3099.00· ESCO/ISCO 7512

Industrial engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model processes, balances and a first plant layout.
Estimate

No public source provides a precise figure. This is our estimate.

22%45%+9.9
Draft procedures, PFDs and operating instructions.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Analyse cost, bottlenecks and OEE from data.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Coordinate suppliers, maintenance and production.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Commissioning and plant trials.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Capex calls and industrial-safety liability.
Estimate

No public source provides a precise figure. This is our estimate.

12%10%+1.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Commissioning and plant trials
  • ingeniero industrial
  • industrial engineer
  • procesos industriales

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Analyse my job

Jobs with similar scores

  1. 322Foley artist22%
  2. 323Poultry farmer22%
  3. 324Botanist22%
  4. 326Forensic scientist22%
  5. 327Hotel concierge22%
  6. 328Detective22%