Automation index
How much of a Cider maker’s job can AI already do?
A must analysis comes earlier. Fermenting and pouring at the point do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Cider maker
22%
AI can already do 22% of this job.
#449 / 733
View rankingCider maker
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Apple, mill and the must.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Press, ferment and the one that sours.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Rack, the gas and the pour point.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The cellar, this year’s cider and the bar.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The festival, the public and not tapping early.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
At the point, and not selling the sour.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- mill apples
- the press
- ferment cider
- pour from height
- rack
- the cider bar
- must
- barrels
Sources for this job· O*NET 51-9012.00· ESCO/ISCO 8160
IS WORK OVER?
Railway engineer
22%
#389 / 733
View rankingRailway engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Track, geometry and the study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Points, the blade and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
OLE, the height and the gauge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the possession and not leaving the wire wrong.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not derail, and not signing half-done points.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- track geometry
- points
- OLE
- gauge
- possessions
- blades
- railway studies
- not jump to a yes
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142