Automation index
How much of a CISO’s job can AI already do?
A risk dashboard comes earlier. Saying no to the business and riding out the incident do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
CISO
25%
AI can already do 25% of this job.
#256 / 753
View rankingCISO
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Risks, policies and the control map.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
The incident, the board and talk to press or not.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Budget, vendors and cyber insurance.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Audit, ISO and briefing the board.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The business that wants to ship now, and the no.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Ride out the incident, and not lying to the board.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- risk map
- security policies
- handle incidents
- ISO 27001
- cyber insurance
- brief the board
- say no to the business
- security controls
Sources for this job· O*NET 11-3021.00· ESCO/ISCO 1330
IS WORK OVER?
Aerospace technician
19%
#647 / 753
View rankingAerospace technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Bench, the protocol and the torque.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Part, the lockwire and the one left loose.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
NDT, the crack and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Engine, the run and the one that does not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The engineer, the rush and not signing half done.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Torque it, and not leaving the lockwire loose.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- test bench
- torque
- lockwire
- aerospace NDT
- engine runs
- protocols
- cracks
- not sign half done
Sources for this job· O*NET 17-3021.00· ESCO/ISCO 3115