Automation index
How much of a CISO’s job can AI already do?
A risk dashboard comes earlier. Saying no to the business and riding out the incident do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
CISO
25%
AI can already do 25% of this job.
#217 / 623
View rankingCISO
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Risks, policies and the control map.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
The incident, the board and talk to press or not.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Budget, vendors and cyber insurance.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Audit, ISO and briefing the board.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The business that wants to ship now, and the no.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Ride out the incident, and not lying to the board.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- risk map
- security policies
- handle incidents
- ISO 27001
- cyber insurance
- brief the board
- say no to the business
- security controls
Sources for this job· O*NET 11-3021.00· ESCO/ISCO 1330
IS WORK OVER?
Structural engineer
26%
#204 / 623
View rankingStructural engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, combinations and the calculation annex.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Site, rebar and what was not poured that way.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Code, building regs and the sizing note.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Pathology, the crack and shore or not.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
The architect, the deadline and not trimming the depth.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Sign that it stands, and not hiding the assumption.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- calculate structures
- frame model
- calculation annex
- building regs
- rebar
- structural pathology
- load combinations
- shore
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142