Automation index
How much of a Civil engineer’s job can AI already do?
Calcs and drawings speed up. Being on site, stamping, and owning ground that is not the model do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Civil engineer
25%
AI can already do 25% of this job.
#241 / 673
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142
IS WORK OVER?
Art teacher
22%
#394 / 673
View rankingArt teacher
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Project, the sheet and the kit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Classroom, the one who will not dare and the one who bins it.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Technique, the mistake and not doing it for them.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Show, the corridor and not hanging only the pretty.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Staff, 'it's a soft subject', and not dropping the bar.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That they get dirty, and not copying the model.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- art sheets
- art projects
- technique
- school shows
- classroom kit
- not do it for them
- the bar
- getting dirty
Sources for this job· O*NET 25-2031.00· ESCO/ISCO 2330