Automation index
How much of a Civil engineer’s job can AI already do?
Calcs and drawings speed up. Being on site, stamping, and owning ground that is not the model do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Civil engineer
25%
AI can already do 25% of this job.
#231 / 633
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142
IS WORK OVER?
Audiologist
23%
#288 / 633
View rankingAudiologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Audiograms, thresholds and a first fit.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Trial, mould and adapt the aid.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Explain, habituation and follow-up.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Reports for ENT and notes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Repair, clean and prototype stock.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Children, older people and not overselling.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 23% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Audiograms, thresholds and a first fit
- Trial, mould and adapt the aid
- Explain, habituation and follow-up
- Reports for ENT and notes
- Repair, clean and prototype stock
- Children, older people and not overselling
- audiologo
- audiologist
Sources for this job· O*NET 29-1181.00· ESCO/ISCO 2266