Automation index
How much of a Civil engineer’s job can AI already do?
Calcs and drawings speed up. Being on site, stamping, and owning ground that is not the model do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Civil engineer
25%
AI can already do 25% of this job.
#231 / 633
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142
IS WORK OVER?
Civil protection volunteer
18%
#578 / 633
View rankingCivil protection volunteer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Protocols, logs and radios.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Deploy, rescue and emergency logistics.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Public, evacuation and calm.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Kit, stores and maintenance.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Shifts, fatigue and 112 coordination.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
Not getting in the firefighters’ way or leaving someone.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Protocols, logs and radios
- Deploy, rescue and emergency logistics
- Public, evacuation and calm
- Kit, stores and maintenance
- Shifts, fatigue and 112 coordination
- proteccion civil
- civil protection
Sources for this job· O*NET 33-2022.00· ESCO/ISCO 5419