How much of a Civil engineer’s job can AI already do?

Calcs and drawings speed up. Being on site, stamping, and owning ground that is not the model do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Civil engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Structural calcs and code checks.
Estimate

No public source provides a precise figure. This is our estimate.

22%42%+9.2
Drawings, quantities and cost estimate.
Estimate

No public source provides a precise figure. This is our estimate.

18%38%+6.8
Geotech and simplified impact reports.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Coordination with contractor, council and suppliers.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Site execution and safety control.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site authority and responsible signature.
Estimate

No public source provides a precise figure. This is our estimate.

12%10%+1.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Structural calcs and code checks
  • Drawings, quantities and cost estimate
  • Geotech and simplified impact reports
  • Site execution and safety control
  • Site authority and responsible signature
  • ingeniero civil
  • civil engineer
  • obras publicas
  • caminos

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Commissioning engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Protocol, the loop and the punch.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Plant, start-up and the one that is not ready.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Test, the trip and not jumping it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Vendors, the one who does not come and the spare.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The client, the deadline and not signing half done.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Start up, and not leaving the interlock jumped.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • test protocols
  • loops
  • punch list
  • start-up
  • trips
  • vendors
  • interlocks
  • not sign half done

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 262Aerospace engineer25%
  2. 263Environmental engineer25%
  3. 264Biomedical engineer25%
  4. 266Petroleum engineer25%
  5. 267Production engineer25%
  6. 268Robotics engineer25%