IS WORK OVER?

Automation index

How much of a Civil engineer’s job can AI already do?

Calcs and drawings speed up. Being on site, stamping, and owning ground that is not the model do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Civil engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Structural calcs and code checks.
Estimate

No public source provides a precise figure. This is our estimate.

22%42%+9.2
Drawings, quantities and cost estimate.
Estimate

No public source provides a precise figure. This is our estimate.

18%38%+6.8
Geotech and simplified impact reports.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Coordination with contractor, council and suppliers.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Site execution and safety control.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site authority and responsible signature.
Estimate

No public source provides a precise figure. This is our estimate.

12%10%+1.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Structural calcs and code checks
  • Drawings, quantities and cost estimate
  • Geotech and simplified impact reports
  • Site execution and safety control
  • Site authority and responsible signature
  • ingeniero civil
  • civil engineer
  • obras publicas
  • caminos

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Data protection inspector

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Notice, the file and the deadline.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Inspection, the processing and what is not there.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Breach, the notice and not delaying.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Fine, the test and not hunting the sole trader extra.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The director, the note and not leaking the file.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Walk into the file, and not leaving the data lying around.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • files
  • processing
  • breaches
  • notices
  • data fines
  • AEPD deadlines
  • sole traders
  • not leak files

Sources for this job· O*NET 13-1041.00· ESCO/ISCO 2422

Analyse my job

Jobs with similar scores

  1. 259Aerospace engineer25%
  2. 260Environmental engineer25%
  3. 261Biomedical engineer25%
  4. 263Petroleum engineer25%
  5. 264Production engineer25%
  6. 265Robotics engineer25%